Weather delay tool
Weather record

Construction weather in Basildon, March 2026

Daily rainfall, frost and wind for Basildon against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Basildon — 1 Mar 2026 to 31 Mar 2026

SS14 1BA · 1 Mar 202631 Mar 2026

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Mar 20260.35.411.634
2 Mar 20260.08.114.428
3 Mar 20260.05.413.117
4 Mar 20260.05.311.816
5 Mar 20260.06.216.618
6 Mar 20263.17.912.815
7 Mar 20260.07.29.217
8 Mar 20260.07.09.516
9 Mar 20263.56.715.516
10 Mar 20260.08.412.426
11 Mar 20261.97.112.134
12 Mar 20260.26.111.752wind
13 Mar 20266.14.111.349wet · wind
14 Mar 20260.21.710.225
15 Mar 20262.12.611.546
16 Mar 20260.15.211.530
17 Mar 20260.08.813.730
18 Mar 20260.07.815.722
19 Mar 20260.06.014.417
20 Mar 20260.03.412.416
21 Mar 20260.02.211.215
22 Mar 20260.01.911.215
23 Mar 20260.03.013.916
24 Mar 20260.58.413.443
25 Mar 20261.44.29.944
26 Mar 20260.01.88.825
27 Mar 20260.74.511.626
28 Mar 20260.64.09.432
29 Mar 20260.32.110.237
30 Mar 20260.36.510.938
31 Mar 20260.16.214.920

1 day with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates