Weather delay tool
Weather record

Construction weather in Blackpool, March 2026

Daily rainfall, frost and wind for Blackpool against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Blackpool — 1 Mar 2026 to 31 Mar 2026

FY1 4BJ · 1 Mar 202631 Mar 2026

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Mar 20260.04.712.834
2 Mar 20261.57.511.335
3 Mar 20260.01.710.817
4 Mar 20260.05.513.822
5 Mar 20261.86.014.724
6 Mar 20265.44.06.924wet
7 Mar 20260.00.59.017
8 Mar 20260.02.011.617
9 Mar 20261.07.611.418
10 Mar 20260.75.011.235
11 Mar 20261.67.410.242
12 Mar 20265.17.311.962wet · wind
13 Mar 20267.73.36.947wet
14 Mar 20261.54.08.622
15 Mar 20267.75.18.635wet
16 Mar 20268.95.19.940wet
17 Mar 20260.39.015.532
18 Mar 20260.05.916.717
19 Mar 20260.06.616.519
20 Mar 20260.04.713.114
21 Mar 20260.02.113.112
22 Mar 20260.00.810.018
23 Mar 20260.01.510.421
24 Mar 202632.44.910.449wet · wind
25 Mar 20268.93.76.652wet · wind
26 Mar 20261.32.47.629
27 Mar 202610.26.79.929wet
28 Mar 20264.34.37.846
29 Mar 20267.75.910.447wet · wind
30 Mar 20261.66.59.941
31 Mar 20260.88.612.526

9 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates