Weather delay tool
Weather record

Construction weather in Bradford, March 2025

Daily rainfall, frost and wind for Bradford against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Bradford — 1 Mar 2025 to 31 Mar 2025

BD1 1HY · 1 Mar 202531 Mar 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Mar 20250.00.38.918
2 Mar 20250.01.89.122
3 Mar 20250.03.89.828
4 Mar 20250.03.99.725
5 Mar 20250.03.511.327
6 Mar 20253.65.415.224
7 Mar 20251.28.114.319
8 Mar 20253.55.715.118
9 Mar 20250.03.613.714
10 Mar 20250.03.69.434
11 Mar 20250.02.16.624
12 Mar 20251.30.56.332
13 Mar 20251.01.15.632
14 Mar 20251.00.67.323
15 Mar 20250.00.76.715
16 Mar 20250.6-0.57.821frost
17 Mar 20250.41.66.724
18 Mar 20250.0-1.19.322frost
19 Mar 20250.0-1.510.412frost
20 Mar 20250.01.014.816
21 Mar 20250.04.314.224
22 Mar 20254.98.113.917
23 Mar 20251.24.89.827
24 Mar 20250.02.612.022
25 Mar 20250.05.913.329
26 Mar 20250.04.012.718
27 Mar 20250.26.615.232
28 Mar 20253.45.310.340
29 Mar 20250.94.110.150wind
30 Mar 20250.06.712.551wind
31 Mar 20250.23.414.911

0 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates