Weather delay tool
Weather record

Construction weather in Brighton, February 2025

Daily rainfall, frost and wind for Brighton against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Brighton — 1 Feb 2025 to 28 Feb 2025

BN1 1UG · 1 Feb 202528 Feb 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Feb 20250.04.06.519
2 Feb 20250.03.46.820
3 Feb 20250.12.78.423
4 Feb 20250.47.39.835
5 Feb 20250.03.59.916
6 Feb 20250.01.57.730
7 Feb 20252.33.34.235
8 Feb 20254.12.66.824
9 Feb 20252.01.55.627
10 Feb 20252.02.55.130
11 Feb 20250.02.55.519
12 Feb 20250.12.56.017
13 Feb 20250.41.45.922
14 Feb 20250.01.34.231
15 Feb 20250.03.65.124
16 Feb 20250.02.24.625
17 Feb 20250.00.45.124
18 Feb 20250.00.46.028
19 Feb 20250.13.88.925
20 Feb 20254.98.311.844
21 Feb 202511.210.312.640wet
22 Feb 202512.17.511.427wet
23 Feb 20254.17.410.744
24 Feb 202515.18.311.049wet · wind
25 Feb 20251.55.210.423
26 Feb 20256.24.18.341wet
27 Feb 20250.42.99.227
28 Feb 20250.1-0.29.215frost

4 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates