Weather delay tool
Weather record

Construction weather in Brighton, July 2025

Daily rainfall, frost and wind for Brighton against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Brighton — 1 Jul 2025 to 31 Jul 2025

BN1 1UG · 1 Jul 202531 Jul 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Jul 20250.119.825.425
2 Jul 20251.517.523.030
3 Jul 20250.012.220.025
4 Jul 20250.012.520.727
5 Jul 20251.815.618.844
6 Jul 202514.616.921.030wet
7 Jul 20255.813.819.531wet
8 Jul 20250.112.220.530
9 Jul 20250.012.321.325
10 Jul 20250.015.624.519
11 Jul 20250.015.524.421
12 Jul 20250.016.325.122
13 Jul 20250.014.323.721
14 Jul 20251.416.720.341
15 Jul 20251.715.918.847
16 Jul 20250.015.323.032
17 Jul 20250.417.721.628
18 Jul 20250.217.722.518
19 Jul 202531.917.121.125wet
20 Jul 202510.015.218.833wet
21 Jul 20255.115.120.935wet
22 Jul 20254.315.720.333
23 Jul 20250.614.821.118
24 Jul 20251.414.721.930
25 Jul 20250.415.722.321
26 Jul 20252.215.421.123
27 Jul 20250.314.920.620
28 Jul 20250.313.420.726
29 Jul 20252.314.218.721
30 Jul 20252.015.321.422
31 Jul 20255.715.320.728wet

6 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates