Construction weather in Cambridge, May 2025

Daily rainfall, frost and wind for Cambridge against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Cambridge — 1 May 2025 to 31 May 2025

CB2 3QJ · 1 May 202531 May 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 May 20250.08.425.813
2 May 20250.012.919.517
3 May 20250.08.917.430
4 May 20250.76.311.830
5 May 20250.15.013.536
6 May 20250.25.012.624
7 May 20250.03.414.727
8 May 20250.16.914.125
9 May 20250.04.417.324
10 May 20250.07.120.024
11 May 20250.09.122.126
12 May 20251.211.223.729
13 May 20250.010.122.022
14 May 20250.06.719.427
15 May 20250.38.013.433
16 May 20250.06.015.830
17 May 20250.17.917.622
18 May 20250.08.916.421
19 May 20250.05.818.917
20 May 20250.06.619.717
21 May 20250.19.417.825
22 May 20250.25.713.222
23 May 20250.13.218.522
24 May 20258.912.120.930wet
25 May 20250.912.918.236
26 May 20250.69.817.434
27 May 20258.513.016.636wet
28 May 20254.813.218.330
29 May 20251.712.823.240
30 May 20250.214.623.529
31 May 20250.013.624.221

2 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.