Weather delay tool
Weather record

Construction weather in Cambridge, July 2025

Daily rainfall, frost and wind for Cambridge against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Cambridge — 1 Jul 2025 to 31 Jul 2025

CB2 3QJ · 1 Jul 202531 Jul 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Jul 20250.018.829.521
2 Jul 20250.814.921.731
3 Jul 20250.010.922.417
4 Jul 20250.012.425.832
5 Jul 20250.215.922.537
6 Jul 202514.014.721.725wet
7 Jul 20255.513.019.130wet
8 Jul 20250.211.021.626
9 Jul 20250.310.524.817
10 Jul 20250.014.928.019
11 Jul 20250.015.130.220
12 Jul 20250.015.227.321
13 Jul 20250.014.826.019
14 Jul 20250.316.825.834
15 Jul 20251.813.621.137
16 Jul 20250.114.222.830
17 Jul 20250.814.524.919
18 Jul 20250.218.028.420
19 Jul 202532.818.322.619wet
20 Jul 202510.715.621.128wet
21 Jul 20253.712.421.920
22 Jul 20252.514.522.222
23 Jul 20252.014.321.719
24 Jul 20252.514.719.229
25 Jul 20250.012.725.019
26 Jul 20252.515.421.418
27 Jul 20250.313.320.621
28 Jul 20250.312.923.021
29 Jul 20250.212.421.018
30 Jul 20251.315.624.024
31 Jul 20253.114.824.021

4 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates