Weather delay tool
Weather record

Construction weather in Cambridge, August 2025

Daily rainfall, frost and wind for Cambridge against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Cambridge — 1 Aug 2025 to 31 Aug 2025

CB2 3QJ · 1 Aug 202531 Aug 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Aug 20253.913.518.422
2 Aug 20250.013.920.522
3 Aug 20250.611.324.428
4 Aug 20251.815.422.244
5 Aug 20250.012.720.936
6 Aug 20250.010.623.119
7 Aug 20251.314.524.932
8 Aug 20250.114.324.721
9 Aug 20250.012.825.630
10 Aug 20250.012.525.715
11 Aug 20250.014.828.418
12 Aug 20250.017.731.117
13 Aug 20250.015.230.326
14 Aug 20250.016.726.722
15 Aug 20250.016.527.419
16 Aug 20250.114.523.021
17 Aug 20250.010.924.526
18 Aug 20250.316.021.821
19 Aug 20250.013.922.727
20 Aug 20250.014.919.429
21 Aug 20250.512.818.526
22 Aug 20250.08.422.518
23 Aug 20250.012.121.817
24 Aug 20250.012.823.617
25 Aug 20250.013.126.324
26 Aug 20250.516.725.427
27 Aug 20250.414.522.933
28 Aug 20251.012.122.132
29 Aug 202516.914.119.920wet
30 Aug 20252.412.421.837
31 Aug 20250.213.321.232

1 day with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates