Weather delay tool
Weather record

Construction weather in Cambridge, November 2025

Daily rainfall, frost and wind for Cambridge against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Cambridge — 1 Nov 2025 to 30 Nov 2025

CB2 3QJ · 1 Nov 202530 Nov 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Nov 20258.58.614.839wet
2 Nov 20251.16.411.924
3 Nov 20250.06.716.645
4 Nov 20250.013.416.435
5 Nov 20250.014.116.934
6 Nov 20253.713.116.222
7 Nov 20250.911.215.425
8 Nov 20250.08.114.218
9 Nov 20250.06.113.926
10 Nov 20259.78.813.430wet
11 Nov 20250.67.015.235
12 Nov 20251.612.316.238
13 Nov 20253.311.216.325
14 Nov 202532.610.512.433wet
15 Nov 20253.29.611.826
16 Nov 20250.96.19.524
17 Nov 20250.01.76.826
18 Nov 20250.4-0.57.021frost
19 Nov 20254.71.05.540
20 Nov 20250.0-1.93.528frost
21 Nov 20250.0-1.15.123frost
22 Nov 20256.10.47.733wet
23 Nov 20253.74.49.434
24 Nov 20250.43.36.728
25 Nov 20250.03.16.927
26 Nov 20250.0-2.07.324frost
27 Nov 20251.27.913.629
28 Nov 20250.08.013.433
29 Nov 20254.24.711.034
30 Nov 20250.02.77.325

4 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates