Weather delay tool
Weather record

Construction weather in Doncaster, April 2025

Daily rainfall, frost and wind for Doncaster against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Doncaster — 1 Apr 2025 to 30 Apr 2025

DN1 1SL · 1 Apr 202530 Apr 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Apr 20250.02.513.523
2 Apr 20250.03.513.826
3 Apr 20250.04.915.325
4 Apr 20250.04.715.526
5 Apr 20250.04.012.324
6 Apr 20250.02.912.821
7 Apr 20250.00.112.813
8 Apr 20250.00.413.612
9 Apr 20250.00.811.920
10 Apr 20250.05.017.013
11 Apr 20250.07.719.414
12 Apr 20250.06.019.520
13 Apr 20250.27.613.624
14 Apr 20250.04.414.632
15 Apr 20250.77.013.615
16 Apr 20250.97.510.742
17 Apr 20250.04.914.826
18 Apr 20250.15.415.830
19 Apr 20250.27.412.625
20 Apr 20250.05.113.217
21 Apr 20256.35.911.314wet
22 Apr 20250.34.315.316
23 Apr 20250.16.615.521
24 Apr 20250.36.712.914
25 Apr 20250.13.513.117
26 Apr 20250.14.615.715
27 Apr 20250.07.720.220
28 Apr 20250.08.521.213
29 Apr 20250.09.223.018
30 Apr 20250.010.224.014

1 day with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates