Weather delay tool
Weather record

Construction weather in Gloucester, February 2026

Daily rainfall, frost and wind for Gloucester against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Gloucester — 1 Feb 2026 to 28 Feb 2026

GL1 1PA · 1 Feb 202628 Feb 2026

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Feb 20265.73.18.013wet
2 Feb 20260.12.58.925
3 Feb 20268.62.56.525wet
4 Feb 20260.52.610.525
5 Feb 202610.06.27.631wet
6 Feb 20268.56.710.521wet
7 Feb 20263.56.310.728
8 Feb 20262.56.29.921
9 Feb 20260.96.710.225
10 Feb 20261.77.910.922
11 Feb 20264.66.311.330
12 Feb 20260.94.49.921
13 Feb 20268.82.77.230wet
14 Feb 20260.1-0.95.725frost
15 Feb 20268.42.29.533wet
16 Feb 20261.14.08.736
17 Feb 20260.00.25.819
18 Feb 20266.62.45.630wet
19 Feb 20265.12.75.724wet
20 Feb 20264.03.711.241
21 Feb 20264.38.113.128
22 Feb 20261.49.512.730
23 Feb 20260.98.312.532
24 Feb 20260.59.314.733
25 Feb 20260.07.814.426
26 Feb 20264.010.212.843
27 Feb 202611.38.413.125wet
28 Feb 20261.95.410.024

9 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates