Weather delay tool
Weather record

Construction weather in Manchester, February 2025

Daily rainfall, frost and wind for Manchester against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Manchester — 1 Feb 2025 to 28 Feb 2025

M1 1AE · 1 Feb 202528 Feb 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Feb 20250.03.77.024
2 Feb 20250.03.27.523
3 Feb 20250.05.410.125
4 Feb 20250.85.710.132
5 Feb 20250.41.77.617
6 Feb 20250.0-1.47.319frost
7 Feb 20250.22.85.641
8 Feb 20251.42.34.720
9 Feb 20250.84.17.232
10 Feb 20250.74.05.031
11 Feb 20250.03.65.522
12 Feb 20250.03.66.620
13 Feb 20250.11.64.519
14 Feb 20250.60.05.426frost
15 Feb 20250.72.84.712
16 Feb 20250.41.54.720
17 Feb 20250.00.14.923
18 Feb 20250.0-0.35.717frost
19 Feb 20251.31.38.423
20 Feb 202513.08.313.739wet
21 Feb 20254.29.314.547
22 Feb 20250.66.812.422
23 Feb 202511.16.311.045wet
24 Feb 20252.57.211.431
25 Feb 20255.83.58.928wet
26 Feb 20259.42.68.522wet
27 Feb 20250.11.28.819
28 Feb 20250.0-0.38.18frost

4 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates