Weather delay tool
Weather record

Construction weather in Manchester, March 2026

Daily rainfall, frost and wind for Manchester against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Manchester — 1 Mar 2026 to 31 Mar 2026

M1 1AE · 1 Mar 202631 Mar 2026

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Mar 20263.05.213.233
2 Mar 20263.48.213.335
3 Mar 20260.03.611.612
4 Mar 20260.05.614.017
5 Mar 20261.76.115.717
6 Mar 20263.75.38.116
7 Mar 20260.55.79.215
8 Mar 20260.36.311.814
9 Mar 20260.48.311.117
10 Mar 20261.05.111.132
11 Mar 20262.97.110.436
12 Mar 202612.86.812.652wet · wind
13 Mar 20267.22.78.436wet
14 Mar 20260.11.09.121
15 Mar 20266.73.410.240wet
16 Mar 20265.73.110.026wet
17 Mar 20260.29.915.432
18 Mar 20260.06.018.113
19 Mar 20260.06.516.314
20 Mar 20260.04.813.28
21 Mar 20260.04.114.69
22 Mar 20260.03.411.817
23 Mar 20260.03.110.716
24 Mar 202614.05.312.645wet
25 Mar 202613.93.76.444wet
26 Mar 20260.00.68.621
27 Mar 20264.96.110.628
28 Mar 20264.43.38.137
29 Mar 20267.73.511.042wet
30 Mar 20264.76.310.443
31 Mar 20261.17.514.525

7 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates