Weather delay tool
Weather record

Construction weather in Norwich, July 2025

Daily rainfall, frost and wind for Norwich against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

Norwich — 1 Jul 2025 to 31 Jul 2025

NR1 3QL · 1 Jul 202531 Jul 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Jul 20250.017.529.224
2 Jul 20252.615.020.030
3 Jul 20250.011.121.223
4 Jul 20250.012.124.931
5 Jul 20250.915.422.837
6 Jul 20259.614.323.321wet
7 Jul 20251.713.317.237
8 Jul 20250.511.520.030
9 Jul 20250.311.324.214
10 Jul 20250.013.525.420
11 Jul 20250.014.728.426
12 Jul 20250.015.123.823
13 Jul 20253.215.023.521
14 Jul 20251.316.525.832
15 Jul 20252.213.322.132
16 Jul 20251.114.120.731
17 Jul 20250.011.424.623
18 Jul 20252.116.927.826
19 Jul 20256.118.123.723wet
20 Jul 20254.016.021.529
21 Jul 20254.114.120.719
22 Jul 20257.514.523.024wet
23 Jul 20252.615.119.919
24 Jul 20256.515.219.032wet
25 Jul 20250.013.823.819
26 Jul 20255.814.921.214wet
27 Jul 20250.613.819.822
28 Jul 20250.812.920.923
29 Jul 20251.112.921.019
30 Jul 20250.812.622.421
31 Jul 20251.214.221.722

5 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates