Daily rainfall, frost and wind for Reading against the 10-year average — the starting point for any weather delay conversation on site.
Weather delay record
RG1 1LX · 1 Feb 2025 – 28 Feb 2025
Rainfall over this period was 112% of the 10-year average for the same calendar window at this location. Conditions were broadly in line with typical for the time of year.
Rainfall vs 10-yr avg
112%
60 mm vs 54 mm typical
Rain days >5mm
5
typical: 3.4
Frost days
4
typical: 5.9
High-wind days
0
gusts ≥ 47 mph
Daily record
| Date | Rain (mm) | Min °C | Max °C | Gust (mph) | Flags |
|---|---|---|---|---|---|
| 1 Feb 2025 | 0.0 | 3.6 | 7.3 | 19 | |
| 2 Feb 2025 | 0.0 | 0.7 | 8.0 | 18 | |
| 3 Feb 2025 | 0.0 | -0.1 | 9.3 | 20 | frost |
| 4 Feb 2025 | 0.4 | 5.0 | 10.5 | 39 | |
| 5 Feb 2025 | 0.0 | 3.1 | 9.4 | 17 | |
| 6 Feb 2025 | 0.0 | -0.2 | 7.1 | 27 | frost |
| 7 Feb 2025 | 5.1 | 1.8 | 3.5 | 35 | wet |
| 8 Feb 2025 | 2.0 | 2.6 | 5.5 | 21 | |
| 9 Feb 2025 | 1.6 | 0.4 | 5.9 | 23 | |
| 10 Feb 2025 | 2.9 | 2.4 | 3.8 | 28 | |
| 11 Feb 2025 | 0.0 | 2.5 | 5.1 | 18 | |
| 12 Feb 2025 | 0.1 | 2.5 | 5.9 | 17 | |
| 13 Feb 2025 | 0.2 | 1.4 | 4.7 | 19 | |
| 14 Feb 2025 | 0.0 | 0.4 | 5.1 | 30 | |
| 15 Feb 2025 | 2.0 | 2.9 | 5.8 | 18 | |
| 16 Feb 2025 | 0.0 | 1.2 | 4.3 | 23 | |
| 17 Feb 2025 | 0.0 | -1.7 | 5.5 | 19 | frost |
| 18 Feb 2025 | 0.0 | -1.4 | 7.0 | 22 | frost |
| 19 Feb 2025 | 0.0 | 0.9 | 8.7 | 18 | |
| 20 Feb 2025 | 5.5 | 7.7 | 12.7 | 35 | wet |
| 21 Feb 2025 | 5.6 | 10.6 | 14.5 | 37 | wet |
| 22 Feb 2025 | 1.9 | 6.4 | 13.0 | 21 | |
| 23 Feb 2025 | 4.1 | 5.7 | 10.9 | 45 | |
| 24 Feb 2025 | 14.9 | 7.0 | 12.5 | 38 | wet |
| 25 Feb 2025 | 2.5 | 4.7 | 10.4 | 22 | |
| 26 Feb 2025 | 11.1 | 2.8 | 8.4 | 30 | wet |
| 27 Feb 2025 | 0.0 | 2.7 | 9.5 | 28 | |
| 28 Feb 2025 | 0.0 | 0.1 | 9.2 | 12 |
5 days with rainfall over 5 mm in this period.
Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.
Need this for your exact site and dates?
Run the free tool with your postcode and claim period — print-ready evidence in seconds.
Check your site's dates