Weather delay tool
Weather record

Construction weather in York, February 2025

Daily rainfall, frost and wind for York against the 10-year average — the starting point for any weather delay conversation on site.

Weather delay record

York — 1 Feb 2025 to 28 Feb 2025

YO1 8QG · 1 Feb 202528 Feb 2025

Daily record

DateRain (mm)Min °CMax °CGust (mph)Flags
1 Feb 20250.03.06.424
2 Feb 20250.02.47.224
3 Feb 20250.02.19.523
4 Feb 20250.35.610.232
5 Feb 20250.00.57.823
6 Feb 20250.0-2.57.113frost
7 Feb 20250.10.95.938
8 Feb 20250.32.35.624
9 Feb 20251.34.27.529
10 Feb 20252.43.84.925
11 Feb 20251.13.95.229
12 Feb 20250.13.66.223
13 Feb 20250.12.34.919
14 Feb 20250.01.34.523
15 Feb 20250.91.53.518
16 Feb 20251.31.74.722
17 Feb 20250.00.24.325
18 Feb 20250.0-0.84.828frost
19 Feb 20250.20.25.327
20 Feb 20258.55.914.642wet
21 Feb 20251.68.515.453wind
22 Feb 20250.05.812.723
23 Feb 20256.75.111.040wet
24 Feb 20251.36.411.830
25 Feb 20250.03.39.730
26 Feb 20252.21.09.122
27 Feb 20250.30.59.125
28 Feb 20250.0-1.99.29frost

2 days with rainfall over 5 mm in this period.

Data: ERA5 reanalysis via Open-Meteo, taken at the nearest model grid point to the postcode — not a Met Office station record. Baselines are the mean of the same calendar months over the previous 10 years at this location. Whether conditions meet a contractual test (e.g. JCT “exceptionally adverse weather” or an NEC 1-in-10-year event) is a matter for the contract — this is a factual weather record, not advice.

Need this for your exact site and dates?

Run the free tool with your postcode and claim period — print-ready evidence in seconds.

Check your site's dates